Grand Parkway:
Contractor(s): Park Construction
09/30/2026 – 10/31/2026: NB right turn lane closure on SH-99 frontage road at Peek Rd. Long-term closure. Closure will be left up continuously.Contractor(s): ISI Maintenance
10/02/2026 – 10/03/2026: EB right lane closure on FM-1464 at SH-99 and a NB to SB left turn lane closure on SH-99 frontage road at FM-1464. C...