TON validators have been instructed to update their node software and mytonctrl tooling ahead of a configuration vote tied to the network’s new collator architecture.
The validator preparation includes node commit 140320b and mytonctrl commit 7e90e26. The configuration switch vote was scheduled for August 21 at 08:00 UTC.
The important detail is status.
T...